Installation method and precautions of high temperature bending test machine
The flexural strength of inorganic non-metallic materials such as refractory materials, ceramics, and concrete under high temperature environment is an important indicator for evaluating their comprehensive performance. Therefore, the high temperature flexural test machine, as an instrument and equipment specially used to test the flexural performance of these materials under high temperature, has been highly valued in related fields. Whether the high temperature flexural test machine can play its due test accuracy depends largely on whether it is installed in place. Next, let's introduce the installation method and precautions of the high temperature flexural test machine.
1. Installation method of high temperature flexural test machine
1). Choose a suitable installation site
First, carefully take the high temperature flexural test machine out of the packaging box, and comprehensively check whether the equipment body and all accessories are complete and intact, and whether there is any damage caused by the transportation process. Once any problems are found, contact the supplier in time for processing. The installation site should be well ventilated, away from adverse environments such as moisture and dust, the ground should be flat and solid, the load-bearing capacity should be sufficient, and sufficient operating space should be reserved. At the same time, it is necessary to ensure that the site has a stable three-phase industrial power supply.
2). Level the support base and install the high-temperature resistance furnace
Correct and level the support base of the equipment according to the standard horizontal line to keep it level with the actual ground. This is a prerequisite for ensuring the accuracy of subsequent high-temperature tests. According to the instructions, install the main body, insulation layer and heating elements of the high-temperature electric positive furnace in place in turn, and pay attention to the connection sequence and position between different components.
3). Install the loading system and connect the control and auxiliary systems
Connect the loading system such as hydraulic or pneumatic loading device to the main machine, and complete the assembly and fixation of each component according to the instructions. The installation position and angle of the loading system must be accurate. Connect the temperature control system, data acquisition and analysis and processing system to the main machine correctly as required, and perform necessary debugging and calibration, connect the required cooling water circuit, compressed air or inert gas pipeline for the high-temperature electric positive furnace, and ensure that the equipment can work normally under high temperature.
4). Machine test run
After all installation and assembly are ready, conduct a machine test run without adding samples, check whether the systems are coordinated, and perform troubleshooting and component adjustments. Seriously participate in the installation teaching and operation training provided by the manufacturer, and fully master the use of the high-temperature flexural test machine.
2. Precautions for the installation of high temperature flexural testing machine
1). Operators must strictly abide by various safety regulations, wear necessary labor protection supplies, and ensure personal safety. When moving equipment, sufficient manpower and tools must be prepared in advance, and care must be taken to prevent equipment and components from colliding and falling.
2). Read the instructions carefully, proceed step by step, and do not adjust or omit any steps at will. The connections between different components and systems must be accurate in position, correct in sequence, firm and reliable.
3). Pay attention to the reasonable layout of lines and pipelines to avoid entanglement and uneven force. When debugging components, the parameters must be set strictly in accordance with the specifications, and blind attempts are not allowed.
4). Keep a record of the installation of the entire machine, including component numbers, positions, connection sequences, etc., for subsequent maintenance. If you encounter any difficult problems during the installation process, contact the manufacturer's technical staff in time to avoid unnecessary losses. In short, whether the installation of the high temperature flexural testing machine is reasonable is particularly important for the performance of the equipment. Only by strictly following the specifications and carrying out the installation operations of each link in an orderly manner can we ensure that the equipment is safely and smoothly put into use, and provide solid hardware guarantees for the high temperature flexural strength testing of materials.
Recommended Products
Hot News
-
High temperature load soft creep tester test material type
2025-06-23
-
Installation method and precautions of high temperature bending test machine
2025-06-18
-
Refractoriness under load (RUL) and creep in compression (CIC) testing machine purchasing process and precautions
2025-06-12
-
JZJ Testing Equipment HT706 High Temperature Load Softening Creep Tester was successfully exported to Uzbekistan, helping the Central Asian refractory industry upgrade--Title
2025-05-29
-
Application and characteristics of the Apparent porosity volume density testing machine
2025-05-19
-
The main application of lithium tetraborate
2025-05-13
-
Is it possible to use XRF melting sample for pure copper?
2025-05-08
-
Box-type resistance furnace in jewelry welding
2025-04-27
-
Advantages and Disadvantages of High Temperature Muffle Furnaces for Heat Treatment
2025-04-21
-
How to choose a muffle furnace suitable for high temperature annealing?
2025-04-15